24/7 Emergency Dispatch — Online (416) 609-9290
Industrial commercial plumbing and HVAC project case studies
Projects & Results

Mechanical work that speaks for itself.

A look at the industrial and commercial plumbing and HVAC projects we've delivered — and what the facilities teams we serve have to say about working with us.

Case studies

Built for demanding facilities

Each project below is engineered to the demands of its sector — from food-grade sanitary piping to N+1 redundant cooling for critical environments.

Food Processing

Sanitary process piping & backflow retrofit

Northgate Foods Processing Plant

Replaced 1,400 ft of aging carbon steel process lines with sanitary stainless steel, added RPZ backflow prevention, and brought the facility up to current food-grade code — all without halting production.

1,400 ft
Stainless process piping
0 hrs
Production downtime
3 weeks
On-site turnaround
  • Full sanitary weld documentation & passivation reports
  • RPZ assemblies tested and certified to municipal code
  • Trenchless tie-ins eliminated full-plant shutdown
Request a similar project
Northgate Foods Processing Plant — Sanitary process piping & backflow retrofit
Warehousing

Rooftop HVAC & make-up air replacement

Mercer Distribution Center

Swapped six end-of-life rooftop units and upgraded the make-up air system across a 180,000 sq ft warehouse. Sized new equipment for current load and integrated building automation for night setback.

180k sq ft
Warehouse conditioned
6 RTUs
Replaced & commissioned
23%
Energy use reduction
  • Right-sized equipment cut annual energy spend ~23%
  • BMS integration enabled automated night setback
  • Crews worked in phases to keep bays climate-controlled
Request a similar project
Mercer Distribution Center — Rooftop HVAC & make-up air replacement
Healthcare

Chilled water piping & mechanical room upgrade

St. Ann Regional Hospital

Rebuilt the central chilled water loop and pump skid serving an active patient tower. Coordinated phased cutovers with facilities staff to maintain cooling and meet healthcare uptime requirements.

12 in
Chilled water mains
N+1
Pump redundancy
100%
Uptime maintained
  • N+1 redundant pump skid with soft-start controls
  • Pressure-balanced loop eliminated flow shortfalls
  • Full commissioning report delivered to facilities team
Request a similar project
St. Ann Regional Hospital — Chilled water piping & mechanical room upgrade
Data Centers

Precision cooling infrastructure retrofit

Cobalt Data Center

Expanded the mechanical room with redundant precision cooling loops and leak detection to support a new server hall. All work staged during planned maintenance windows.

2x
Redundant cooling loops
100%
Leak detection coverage
0
Critical environment alerts
  • Dual-loop redundancy maintained SLA during peak load
  • Smart leak detection tied to facility monitoring
  • Staged install kept the data hall online throughout
Request a similar project
Cobalt Data Center — Precision cooling infrastructure retrofit
Testimonials

What our clients say

Facilities managers, plant engineers, and operations leads — in their own words.

"M.R.B kept our line running through an entire process-piping retrofit. The planning was meticulous and the crews were surgical. Zero downtime is rare — they delivered it."

Dana Whitfield
Plant Manager, Northgate Foods

"From quote to commissioning, the communication was better than any contractor we've used. They sized the rooftop units right the first time and our energy bills reflect it."

Marcus Lee
Facilities Director, Mercer Distribution

"They coordinated with our infection-control team and the facilities group like they'd worked here for years. The chilled water upgrade has been flawless."

Priya Anand
Director of Engineering, St. Ann Regional

"M.R.B came in at 2 a.m. for a chiller failure and had us back up before shift change. We've kept them on a maintenance contract ever since."

Tobias Brandt
Site Operations Lead, Cobalt Data Center

Your facility could be next.

Tell us about your project. A mechanical engineer will review scope and follow up within one business day — or book an appointment for on-site assessment.